Project
Midrand Yard
A usable plan for Midrand yard activity involving flexo supply movement, floor coordination, and packaging press support.

Where Midrand Yard fits in a flexo week
Midrand Yard deals with the movement and coordination behind flexo supply work in Midrand. It covers how materials, floor communication and press support fit together when packaging jobs are running across multiple tasks.
Midrand Yard starts with what is moving in and out of site that day. Plates, ink, anilox sleeves, tape, solvent and packed substrate do not travel or wait under the same conditions in Midrand. Gauteng wind, dry air, gate access and vehicle timing can change how support stock reaches the press area.
Photograph the load, bay or handover point before pallets are split or labels are removed. Add reel width, substrate grade, vehicle details and the last confirmed dispatch time to the record. That gives production and stores one reference when a job stalls after receiving.
Midrand dispatch and support checks
Leave the team with a yard plan tied to packaging work, not a vague movement note. Record who receives plates, where inks are held, which press support items must move next, and what cannot be stacked together. One usable handover list prevents missed stock, mixed labels and duplicate trips across site.
Use Midrand Yard with the related contact form only after the job sheet, delivery reference and plate count match. Include the exact job name, one image of the staged material, and a note on anything rejected at goods receiving. Check substrate code, ink reference and route destination again before the vehicle leaves the gate.
- Bay route linked to actual packaging work
- Receiving photo taken before stock is moved
- Job record sent with the correct references
Midrand conditions that change handling
Midrand Yard sits close to busy freight routes, industrial parks and customer sites that run tight packaging schedules. Materials may arrive from Johannesburg stock, Durban suppliers or a converter in another part of Gauteng, then wait for checking before release. Separate repeat replenishment from urgent press support so the wrong pallet does not go first.
Dry inland air can affect tape liners, carton condition and dust build-up on wrapped stock. Afternoon storms, traffic around Midrand and power interruptions can shift receiving times and sample logging. When support items are heading to press, note whether they need shade, sealed storage or immediate issue.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Records to attach to Midrand Yard
Share the Midrand Yard job with yard or floor photos, delivery timing, substrate notes, and what has already failed in production. Make the subject line exact.
Log the yard entry on the day the movement happens, with the job name used by production. Attach delivery photos, substrate details, quantity received and any failed item pulled aside for review. Buyers and press staff can then trace the same packaging job without relying on a verbal update.
What our Flexo Printing customers say
Verified Google reviews